Whitehall Landing, Whitby In Partnership With Harrison ConstructionWhitehall Landing is a 34 berth marina with a particular problem. As the tide falls bedrock is exposed which can damage both boat hulls and pontoons. The challenge was to design a system which would allow the pontoons to sit above the river bed rather than on it at low tide. It should support the boats in an upright position and avoid expensive damage. Our innovative design team suggested a system where the pontoons were built on stilts. The result has worked perfectly. Victor Simmonds, Managing Director of SOLENT MARINE said " We believe that the system we designed for | |
90 Berth Marina In Partnership With The Michael Shanley GroupOn this project Michael Shanley partnered with Solent Marine to enable the design experts to collaborate and share ideas for a 90 Berth Marina. We submitted a layout designed to maximise the number of berths possible from the site , thanks to our experience in this type of construction, the marina was completed on time and within budget. |
|
|